Tel: +84-903809978
Email: ecc45-1@lilama45-1.com
Steel Structure
Steel Beam |
|
Project: Flyover Bridge at Thu Duc Intersection
Client: Thang Long Construction Company
Year completed: 2012
Scope of work: Fabrication of steel-made square beam.
Specification: + Total Length: 278m; Width: 16 m + Number of span: 7; Length of each span: 35 ÷ 45m + Number of lane: 4 (Three lanes for auto and one lane for motorcycle) |
|
Steel Frame |
Project: Vung Ang 1 Thermal Power Plant
Client: Song Hong Joint Stock Company, Branch of Ho Chi Minh City.
Year completed: 2011
Scope of work: Fabrication and installation of steel structure for Coal Bunker Shop