Tel: +84-903809978
Email: ecc45-1@lilama45-1.com
Steel Structure Project
Installation steel structure Turbine house Song Hau 1 Thermal Power Plant | |
Project: Song Hau 1 Thermal Power Plant
Client : Lilama Corporation
Installation location: Mai Dau Town,Chau Thanh district, Hau Giang Province
Year completed: Plan complete 2018
Scope of Work : Installation steel structure Turbine house, Turbine and Generator.
Steel Structure Frame | Steel Structure Frame |
Project: Coal Bulker of Vung Ang 1 Power Plant
Owner: Petro Vietnam Corporation (PVN)
Installation location: Vung Ang 1 Thermal Power Plant, Vung Ang Economic Zone, Ha Tinh Province
Year completed: 2013 (expected)
Capacity: 1,200 MW/year (2 group of machines) |
Project: Hiep Phuoc Cement Grinding Station, Thang Long Cement Plant
Owner: LILAMA Corporation and Ha Noi Procurement and Import & Export Corporation
Installation location: Hiep Phuoc Industrial Zone, Nha Be District, Ho Chi Minh City
Year completed: 2011
Capacity: 6,000 ton Clinker per day ~ 2,3 milion ton cement per year |
Steel Structure |
HRSG Steel Structure |
Project: Hangar A75 Repair Wide Body Aircraft
Owner: Vietnam Airlines Corporation (VNA)
Installation location: Hangar A75 Repair Wide Body Aircraft, Tan Son Nhat Airport, Ho Chi Minh City
Year completed: 2012 (expected)
Technical data: + Total weight: 1,000 tons; Height: 30 m + Dome aperture: 80 m x 95 m |
Project: Group of Phu My Thermal Power Plant Owner: Vietnam Electricity Corporation (EVN)
Installation location: Phu My Industry Zone, Tan Thanh District, Ba Ria Province, Vung Tau
Year completed: 2001 ÷ 2008 Technical data:
|