Tel: +84-903809978
Email: ecc45-1@lilama45-1.com
Installation of equipment for Diamon phosphate fertilizer factory (DAP) No.2 - Lao Cai
Lilama 45.1JSC just received construction package with total value of VND 80 billion include: installation of equipment boiler and chemical tanks for Diammonium Phosphate (DAP) fertilizer Plant No.2 – Lao Cai.
Lilama 45.1JSC undertake the installation of 02 Spherical Pressure Vessels and 04 Vertical Pressure Vessels, company started of construction from 01st May 2013 so far, the company has installation completed 80% equipment of Spherical Pressure Vessels. Spherical Pressure Vessels is special, thus requires rigorous of installation process with high precision technique. Each tank has a diameter 21m , with a capacity of 5000m ³ / tank. The deployment construction of boiler will undertaken in october 2013 expected to be completed on 30 July 2014.
Diammonium Phosphate (DAP) fertilizer Plant No.2 invested by DAP Joint Stock Company No. 2 -VINACHEM with a capacity of 330,000 tonnes / year at Tang Loong Industrial Zone, Bao Thang district, Lao Cai province. Diammonium Phosphate (DAP) fertilizer Plant No.2 includes 3 workshop of main: sulfuric acid workshop,phosphoric acid workshop, DAP Fertilizer workshop. Scheduled for completion and operation in 3rd quarter of 2014
Viet Binh - Thanh Dong