Login

 Skype    |     Zalo    |     Zalo    |    Tiếng Việt Tiếng Việt    |    English English

Site News

installation of Coal Silo 44 tons, Vinh Tan 4 Thermal Power Plant

 

installation of Coal Silo 44 tons, lifting up to 60m high over the roof structure to locate in position of 37m high by 600 tons crawler crane

 

 

 

 

 

 

 

 

Other News