Login

 Skype    |     Zalo    |     Zalo    |    Tiếng Việt Tiếng Việt    |    English English

Site News

Installation of Outlet Header 42 tons at Vinh Tan 4 Thermal Power Plant

 

Today, 10th September 2015, Erection Team No.9 installed Outlet Header 42 tons, 20m length, 2.4m width at Vinh Tan 4 Thermal Power Plant.

 

   

 

 

 

 

 

Erection Team No.9

Other News