Login

 Skype    |     Zalo    |     Zalo    |    Tiếng Việt Tiếng Việt    |    English English

Site News

Assembly and Installation of the generator rotor at Dong Nai 5 Hydropower Project

 

The erection team No. 8 just assembled and installed the generator rotor at Dong Nai 5 Hydropower Plant

 

 

 

 

 

 

Erection Team No. 8

Other News