Login
Skype | Zalo | Zalo | Tiếng Việt | English
Tel: +84-903809978
Email: ecc45-1@lilama45-1.com
Tan Mai - Mien Dong paper factory, Capacity of 150.000 ton.years
Zitron (Export)
Song Hau 1 Thermal Power Plant
Stamping of ASME authorization for vessels (18/01/2012)
Nhon Trach 2 Power Plant begins operations (15/11/2011)
Fabrication and Installing of fuel tanks at bonded warehouse in Van Phong (21/10/2011)
Fabrication and Installing of steel structure of Hangar A75 project (22/07/2011)
Commencement Ceremony of petrol storage warehouse at Cai Lan Port (11/07/2011)
Occupation mechanical engineering in LILAMA 45.1 (12/06/2011)
Diary on Nhon Trach 2 Power Plant Project (23/03/2011)
Successful installation of steam turbine 02 at Vung Ang 1 Thermal Power Plant (22/01/2011)
Stamp for pressure vessels according to ASME (16/01/2011)
Commencement Ceremony Repair Project Hangar Wide-body Aircraft A75 (11/01/2011)