Login

 Skype    |     Zalo    |     Zalo    |    Tiếng Việt Tiếng Việt    |    English English

LILAMA JSC at works of Mong Duong Thermal Power Plant

 At buildings in Mong Duong 1 Thermal Power Plant, Lilama 45.1 Joint Stock Company has started constructed deployment from 25.03.2013, current the company has installation more than 3000 tons of structural steel boiler A2 and and it is expected to accomplished at the end of October 2013.

Work starts on Turbine No. 2 at O Mon 1 Thermal Power Plant

 At the works of turbine 02 - O Mon 1 Thermal Power Plant. Lilama  45.1 Joint Stock Company has started equipment installation of piping water circulation and implementing the construction - installation of boiler equipment. 

LILAMA 45.1 fabricating 10,000 tons of mechanical equipment

Lilama 45.1 Mechanical Factory of Lilama 45.1 Joint Stock Company,  is located at Lot 11, 319 B, Nhon Trach 1 Industrial Zone, Nhon Trach District, Dong Nai Province, has self-enhancement assert itself

Installation of equipment for Diamon phosphate fertilizer factory (DAP) No.2 - Lao Cai

 Lilama 45.1JSC just received  construction package with total value of VND  $ 80 billion VND include: installation of equipment  boiler and chemical tanks for Diammonium Phosphate (DAP) fertilizer Plant No.2 – Lao Cai

<<   5    6    7    8    9    10    11    12    13    14    15   >>