No. |
Tên |
Thời gian |
Khách hàng |
Phạm vi công việc |
1 |
Tan Mai - Mien Dong paper factory, Capacity of 150.000 ton.years |
2019-2020 |
Tan Mai Group |
Maintenance equipment, Installation equipment for Tan Mai - Mien Dong paper factory |
2 |
Zitron (Export) |
2018 |
ZITRON |
Manufacture, pre asembly, packaging and transportation of Conjunto Difusors |
3 |
Long Phu 1 Thermal Power Plant |
08/2017 - 2018 |
LILAMA / PVN |
Material erection for boiler Unit 2 |
4 |
Song Hau 1 Thermal Power Plant |
01/2017-2018 |
LILAMA/Doosan |
Installation of turbine steel structure, Turbine, Generator Unit 1 |
5 |
Long Phu 1 thermal power plant |
08/2017 - 2018 |
LILAMA / PVN |
Eqipment erection for boiler equipment Unit 2 |
6 |
Long Phu 1 thermal power plant |
01/2017 - 2018 |
LILAMA / PVN |
Material erection (piping system, steel structure & accessory) for boiler Unit 1. |
7 |
Ho Chi Minh anti-flood |
02/2017 - 2018 |
Trung Nam Group / LILAMA 45.3 |
Manufacture and erection of mechanical equipment |
8 |
First Solar Project |
08/2017 - 2018 |
Shinryo Vietnam Corporation |
CDA (Compressed Dry Air) & PCW (Process Cooling Water) work, insulation works for PCW pipe, equipments installation work for PCW system |
9 |
Long Phu 1 Thermal Power Plant |
06/2016 - 2018 |
LILAMA/PVN |
Installation of boiler steel structure |
10 |
Song Hau 1 Thermal Power Plant |
06/2016 - 2018 |
LILAMA/Doosan |
Supply of main materials and manufacture of steel structure for Turbine Building |