No. |
Tên |
Thời gian |
Khách hàng |
Phạm vi công việc |
1 |
O Mon 1 Thermal Power Plant - Unit No.2 |
04/2013 - 11/2015 |
DAELIM Industrial Co., Ltd. |
Package A: Mechanical work: Piping work, equipment work, painting work, commisioning assitance, additional works; Design, erection, commissioning of Dearator Storage Tank and Condenser Shall, Condenser skirt & Piping works |
2 |
Ichthys Onshore LNG Facilities |
02/2013 - 03/2015 |
EVAPCO-BLCT DRY COOLING, Inc. |
Modularization, Instaltion & load out of the 18 Modules; Supply (engineering, fabricating) of identical ASME U-Stamped Condensate Tanks and Accessories. |
3 |
DAMB'RI Hydro Power Plant |
08/2011 - 2014 |
Song Hong Investment & Mechanical Construction J.S.C |
Processing steel pipelines |
4 |
Transmission line 500kV Vinh Tan - Song May |
12/2010 - 12/2013 |
EVN/SPPMB |
Construction & Installation of transmission line section G13-G18 |
5 |
Bac Lieu 220KV Transformer Station |
06/2010 - 2013 |
EVN/SPPMB |
Construction and installation of the transformer station and joint sections |
6 |
Hangar A75 - Wide Body Maintenance Hangar |
2010 - 2013 |
Vietnam Airline Corporation (VNA) |
Enginerring, Procurement, Construction for Preparing Hangar of Aircraft A75 |
7 |
Bien Hoa Chemical Factory |
06/2012 - 01/2013 |
South Basic Chemicals Company Ltd. |
Fabrication and installation vessels of chemical storage at Bien Hoa Chemical Factory |
8 |
BARH STPP3 x 660MW Power Plant |
10/2006 - 2012 |
LILAMA Corporation |
Fabrication of equipment and steel structures |
9 |
VGI-3F Project (Glass Factory) |
06/2013 - 03/2015 |
NSG Vietnam Special Glass Ltd |
Fabricating and erecting steel structure, equipment, furnance |
10 |
Hoang Hoa Tham - Cong Hoa overbridge |
06/2013 - 08/2013 |
Thanh Long J.S.C |
Fabrication of steel beams |