No. Tên Thời gian Khách hàng Phạm vi công việc
 1  Transmission line 500kV Vinh Tan - Song May  12/2010 - 12/2013  EVN/SPPMB  Construction & Installation of transmission line section G13-G18
 2  Bac Lieu 220KV Transformer Station  06/2010 - 2013  EVN/SPPMB  Construction and installation of the transformer station and joint sections
 3  Hangar A75 - Wide Body Maintenance Hangar  2010 - 2013  Vietnam Airline Corporation (VNA)  Enginerring, Procurement, Construction for Preparing Hangar of Aircraft A75
 4  Bien Hoa Chemical Factory  06/2012 - 01/2013  South Basic Chemicals Company Ltd.  Fabrication and installation vessels of chemical storage at Bien Hoa Chemical Factory
 5  BARH STPP3 x 660MW Power Plant  10/2006 - 2012  LILAMA Corporation  Fabrication of equipment and steel structures
 6  VGI-3F Project (Glass Factory)  06/2013 - 03/2015  NSG Vietnam Special Glass Ltd  Fabricating and erecting steel structure, equipment, furnance
 7  Hoang Hoa Tham - Cong Hoa overbridge  06/2013 - 08/2013  Thanh Long J.S.C  Fabrication of steel beams
 8  PULLMAN SAIGON CENTRE HOTEL PROJECT  05/2013 - 08/2013  PERMASTEELISA PACIFIC HOLDING LTD  Fabrication, delivery, installation of steel structures
 9  Rolling steel plates for Saigon Offshore  05/2013 - 09/2013  Saigon Offshore Fabrication & Engineering Ltd  Rolling steel plates
 10  VINA KRAFT Paper Co., Ltd.  05/2013 - 07/2013  VINA KRAFT Paper Co., Ltd.  Installion of the equiment, supply of piping, fitting, support, valve & insulation.