No. |
Tên |
Thời gian |
Khách hàng |
Phạm vi công việc |
1 |
Phu My 1 Thermal Power Plant |
1999-2001 |
LILAMA Corporation |
Installation of equipment |
2 |
O Mon 1 TPP No.2 Construction Project |
08/2017 - 11/2017 |
Daelim Industrial Co., Ltd |
Final inspection work: Mechanical Work, Painting, Insulation, NDE |
3 |
Dai Ninh Hydro Power Plant |
2004-2007 |
IHI-SAKAI JOINT VENTURE |
Sub-contract hydromechanical equipment steel penstock work for Dai Ninh Hydro power project |
4 |
Ham Thuan Hydro Power Plant |
1999-2001 |
Hitachi Zosen Co.LTD |
Fabrication and installation of penstock, gate valves |
5 |
Con Dao Wind Power Plant. |
2009-2010 |
Sy Cat Property Develop Consultancy |
Fabrication and installation of 10 Wind Power Plant at Con Dao |
6 |
Vung Ro LPG Terminal Installation |
2005-2006 |
Sai Gon-Phu Yen Petrol Joint Stock Company |
Supply, fabrication and installation gas tank 100 ton (08 sets) |
7 |
Low pressure distribution system Phu My-My Xuan-Go Dau |
2002-2004 |
PV Gas |
Design-Purchasing-Constructing-Commissioning |
8 |
Vũng Áng 1 Thermal Power Plant (2x600MW) |
2010 - 2015 |
PVN/LILAMA |
Installation of boiler equipment & the auxiliary system of machine assembly No.2 |
9 |
LPG for Tra Noc - Can Tho |
1998-2000 |
Petrolimex |
Fabrication and installation of LPG |
10 |
Thang Long - Hai Phong LPG Gas Terminal |
1997-1999 |
Petrolimex |
Fabrication & erection of 04 LPG storage tanks |