 1  Mong Duong 1 Thermal Power plant (2x500MW)  01/2013 - 12/2015  LILAMA  Equiment installation, piping insulation, piping painting and crane supply
 2  O Mon 1 Thermal Power Plant - Unit No.2  08/2014 - 11/2015  KUKJAE Industries Vietnam Co., Ltd  Insulation & Refractory Work
 3  Duc Hoa Main Canal, Package PH4  04/2013 - 12/2015  TAEYOUNG-WASECO Joint Venture  Construction and supply of equipment for canal
 4  Radial truck tyre factory with a capacity of 1.000.000 products per year  07/2013 - 10/2013  The Southern Rubber Industry Joint Stock Company (CASUMINA)  Supply of material & installation of Heat Exchanging and Air compressing Pipeline system for Rubber mixture House. - Aerodynamic pipeline system & Heat Exchanging and Air compressing Pipeline system for radial truck tyre factory
 5  Ton Dong A Joint Stock Company - Thu Dau Mot Branch, Binh Duong Province  07/2013 - 10/2013  Ton Dong A Joint Stock Company  Fabrication and installation of storage tank of rolling oil and inside equipment for No.1 Cool Rolling Machine
 6  Raw Material Handling System  07/2013 - 10/2014  Posco E&C Vietnam Co., Ltd  Supply of material, fabrication of steel structure (Package 3)
 7  Formosa Hot Rolling Mill  08/2013 - 03/2015  Posco E&C Vietnam Co., Ltd  Fabrication of steel structure (Package 3)
 8  VEDAN (VIETNAM) - 350T/H Boilers coal bunker fabrication & site installation  10/2013 - 06/2014  Vedan Vietnam Enterprise Co., Ltd  Manufacture and installation of anchor bolt, accessary equipment, fan and steel structure of coal-fire boiler
 9  DAP No.2 Fertilizer Plant - VINACHEM  05/2013 - 12/2014  Chemical Industry Engineering J.S.C (CECO); Petrolimex Construction JSC-1; TOYO-VIETNAM Coporation Ltd.,  Fabrication and Erection 02 Amoniac Sphere Tanks; 02 H2SO4 Tanks; 02 H3PO4 tanks; tower of metabolic heat, drying tower, chimney; Installation of Boiler &Turbine, Above ground piping work
 10  O Mon 1 Thermal Power Plant - Unit No.2  04/2013 - 11/2015  DAELIM Industrial Co., Ltd.  Package A: Mechanical work: Piping work, equipment work, painting work, commisioning assitance, additional works; Design, erection, commissioning of Dearator Storage Tank and Condenser Shall, Condenser skirt & Piping works