Accomplished Projects

 

No. Tên Thời gian Khách hàng Phạm vi công việc
 1  Ichthys Onshore LNG Facilities  02/2013 - 03/2015  EVAPCO-BLCT DRY COOLING, Inc.  Modularization, Instaltion & load out of the 18 Modules; Supply (engineering, fabricating) of identical ASME U-Stamped Condensate Tanks and Accessories.
 2  DAMB'RI Hydro Power Plant  08/2011 - 2014  Song Hong Investment & Mechanical Construction J.S.C  Processing steel pipelines
 3  Transmission line 500kV Vinh Tan - Song May  12/2010 - 12/2013  EVN/SPPMB  Construction & Installation of transmission line section G13-G18
 4  Bac Lieu 220KV Transformer Station  06/2010 - 2013  EVN/SPPMB  Construction and installation of the transformer station and joint sections
 5  Hangar A75 - Wide Body Maintenance Hangar  2010 - 2013  Vietnam Airline Corporation (VNA)  Enginerring, Procurement, Construction for Preparing Hangar of Aircraft A75
 6  Bien Hoa Chemical Factory  06/2012 - 01/2013  South Basic Chemicals Company Ltd.  Fabrication and installation vessels of chemical storage at Bien Hoa Chemical Factory
 7  BARH STPP3 x 660MW Power Plant  10/2006 - 2012  LILAMA Corporation  Fabrication of equipment and steel structures
 8  VGI-3F Project (Glass Factory)  06/2013 - 03/2015  NSG Vietnam Special Glass Ltd  Fabricating and erecting steel structure, equipment, furnance
 9  Hoang Hoa Tham - Cong Hoa overbridge  06/2013 - 08/2013  Thanh Long J.S.C  Fabrication of steel beams
 10  PULLMAN SAIGON CENTRE HOTEL PROJECT  05/2013 - 08/2013  PERMASTEELISA PACIFIC HOLDING LTD  Fabrication, delivery, installation of steel structures