No. |
Tên |
Thời gian |
Khách hàng |
Phạm vi công việc |
1 |
Rolling steel plates for Saigon Offshore |
05/2013 - 09/2013 |
Saigon Offshore Fabrication & Engineering Ltd |
Rolling steel plates |
2 |
VINA KRAFT Paper Co., Ltd. |
05/2013 - 07/2013 |
VINA KRAFT Paper Co., Ltd. |
Installion of the equiment, supply of piping, fitting, support, valve & insulation. |
3 |
Fabrication of Outlet Duct for SHOAIBA-KINGDOM OF SAUDI ARABIA PROJECT |
2012-2013 |
QUATRON STEEL JSC |
Fabrication & trial assembly of Outlet Duct, Inlet Duct. |
4 |
Hon Chong Cement Plant |
04/2013 - 04/2013 |
Holcim Vietnam Limited |
Supply of repair and maintenance for the plant |
5 |
Vinh Tan 4 Thermal Power Project |
2015-2017 |
LILAMA/DOOSAN |
Installation of Boiler, BOP Equipment, Circulation of Water Piping, E&I System. |
6 |
Vung Ang 1 Thermal Power Plant (2x600MW) |
12/2010 - 12/2012 |
Song Hong J.S.C Corp. - TP. HCM Branch. |
Fabrication & Installation of structure turbine House, bunker & Installation of steel structure for Central Control Building |
7 |
Vung Ang 1 Thermal Power Plant (2x600MW) |
08/2009 - 04/2010 |
PVN/LILAMA |
Design, cost estimate and construction of storage house system |
8 |
Nhon Trach 2 Thermal Power Plant |
2010-2011 |
Petro Vietnam |
Install of Steam and Gas Turbine, Fire Protection System |
9 |
Dak Glun Hydro Power Plant |
2009-2011 |
Sai Gon Machinery Spare Parts Company |
Design, supply material and install equipment |
10 |
O Mon 1 Thermal Power Plant, Can Tho Province |
2006-2009 |
LILAMA Corporation, Mitsubishi Heavy Industries Ltd. |
Installation of mechanical equipment and fabrication of equipment and steel structures; Receiving, transportation, storage, preservation and handling of material on Site; Contruction of emporary items; Supporting Service; Commissioning and handover |