Erection

Tank and Pressure Vessel Project

 

 

Spherical tank  Spherical tank

Project : propane dehydrogenation (PDH) production plant, polypropylene (PP) plant, liquefied petroleum gas (LPG) storage tank, and LPG and petrochemical product warehouse

Client : KHPT/CNI

 

Location:  Cai Mep Industrial Zone, Tan Thanh District,  Ba Ria-Vung Tau

Year completed: 2019

 

Scope of Work: 

+Installation 02 Spherical Pressure vessels

+ Insulation

+ Fire fighting system

 

Specification: 

+ Design code : ASME VIII DIV 2

    Diameter: 26 meter.Thinkness: 54÷ 57 mm

 

 

Spherical Pressure Vessels Crude oil storage Tank

Project :DAP2 Lao Cai Fertilizer Plant

 

Client: Chemical Industry Engineering Joint Stock Company ( CECO )

 

Installation location: Tang Loong Industrial Zone - Bao Thang district - Lao Cai Province

 

Year completed: 2014

 

Scope of Work: 

+Installation 02 Spherical Pressure vessels

+ Insulation

+ Fire fighting system

 

Specification: 

+ Design code : ASME VIII DIV 2

    Diameter: 21.2 mét.Thinkness: 30÷ 35 mm

+ Capacity: 5000 m³

Project: Nghi Sơn Refinery

 

Client: Lilama Corporation

 

Installation: Nghi Son Industrial Zone, Tinh Gia district, Thanh Hoa Province

Year completed: 2017

 

Scope of Work:

+ Installation, Painting 02 crude oil storage tanks

+ Welding by Auto Welding machine for 06 crude oil storage tanks

 

Specification

+ Design code: API St'd 650 11th Ed., Jun 2007 Errata, Oct. 2011 

+ Diameter: 89 m; Height: 19.9 m; Thickness: 14÷ 37.4 mm

+ Capacity: 99,974 m³

 

Spherical Pressure Vessels Spherical Pressure Vessels

Project: Nha Be Gas Storage

 

Client: Kenyon Engineering

 

Installation location: Nha Be Gas Storage, Nha Be District,

Ho Chi Minh City

 

Year completed: 2003

 

Quantity: 2 tanks

 

Technical data: Capacity 500 tons/tank

Project: Dung Quat Refinery

 

Client: LILAMA Corporation

 

Standard for design: ASME VIII, Div. 1

 

Installation location: Dung Quat Refinery, Dung Quat Economic Open Zone Quang Ngai Province

 

Year completed: 2011

 

Quantity: 8 tanks

 

Specification:

+ Diameter: 21m; Height: 26m; Thichness: 42 ÷ 56mm

+ Capacity: 3,500m³

   
   
 Vertical Pressure Vessels Vertical Pressure Vessels

Project: PVC Plant - Dong Nai

 

Client: Hitachi Zozen

 

Installation location: Long Thanh District, Dong Nai Province

 

Year completed: 1997

 

Scope of work: Fabrication and installation of steel structure, tanks, vessels, piping, equipment

 Project: Phu My Fertilizer Plant

 

Client: Samsung Engineering Co. Ltd

 

Installation location: Phu My Industry Zone, Ba Ria Province, Vung Tau

 

Year completed: 2003

 

Scope of work: Fabrication and installation of steel structure, tanks, vessels, piping, HRSG, electric system

   
   
Steam Drums
Steam Drums

Project: Vung Ang 1 Thermal Power Plant

 

Owner: Petro Vietnam Gas Corporation (PV Gas)

  

Installation location: Vung Ang 1 Thermal Power Plant, Vung Ang Economic Zone, Ha Tinh Province

  

Year completed: 2013 (expected)

  

Specification:

+ Length: 32.5 m; Diameter: 2.145 m

+ Weight: 320 tons

+ Installation Height: 46 m

+ Working Pressure: 196.5 bar.g

+ Working Temperature: 364.4 °C

Project: Phu My 4 Thermal Power Plant

 

Owner: Vietnam Electricity Corporation (EVN)

 

Installation location: Phu My 4 Thermal Power Pant, Phu My Industrial Zone, Phu My Townlet, Tan Thanh District, Ba Ria - Vung Tau Province

 

Year completed: 2003

 

Specification:

1. High Pressure Steam Drum:

+Inside Diameter: 1.981 m; Length: 11.957 m; Thichness: 120 mm;

+ Design Pressure: 116 bar.g; Working Temperature: 324°C

 

2. Intermediate Pressure Steam Drum:

+ Inside Diameter: 1.219m; Length: 9.112m, Thichness: 20mm

+ Design pressure: 34 bar.g; Working Temperature: 278°C

 

3. Low Pressure Steam Drum:

+ Inside Diameter: 1.524m; Length: 8.330m; Thickness: 12.7mm

+ Design Pressure: 8 bar.g; Working Temperature: 175°C

   
   
Tanks Tanks

Project: Installation of Fire Fighting System for the Hangar A75 Repair Wide Body Aircraft, Tan Son Nhat Airport

 

Client: Vietnam Airlines Corporation (VNA)

 

Installation location: Tan Son Nhat Airport, Ho Chi Minh City

 

Year completed: 2011

 

Specification:

+ Quantity: 2 tanks
+ Capacity: 1,300 m³ /tank

Project: Installation of Fire Fighting System for the Hangar A75 Repair Wide Body Aircraft, Tan Son Nhat Airport

 

Client: Vietnam Airlines Corporation (VNA)

 

Installation location: Tan Son Nhat Airport, Ho Chi Minh City

 

Year completed: 2011

 

Specification:

+ Quantity: 2 tanks
+ Capacity: 1,300 m³ /tank

 

 

 

 

 