Projects under construction

 

No. Tên Thời gian Khách hàng Phạm vi công việc
 1  Zitron (Export)  2018  ZITRON  Manufacture, pre asembly, packaging and transportation of Conjunto Difusors
 2  Long Phu 1 Thermal Power Plant  08/2017 - 2018  LILAMA / PVN  Material erection for boiler Unit 2
 3  Song Hau 1 Thermal Power Plant  01/2017-2018  LILAMA/Doosan  Installation of turbine steel structure, Turbine, Generator Unit 1
 4  Long Phu 1 thermal power plant  08/2017 - 2018  LILAMA / PVN  Eqipment erection for boiler equipment Unit 2
 5  Long Phu 1 thermal power plant  01/2017 - 2018  LILAMA / PVN  Material erection (piping system, steel structure & accessory) for boiler Unit 1.
 6  Ho Chi Minh anti-flood  02/2017 - 2018  Trung Nam Group / LILAMA 45.3  Manufacture and erection of mechanical equipment
 7  First Solar Project  08/2017 - 2018  Shinryo Vietnam Corporation  CDA (Compressed Dry Air) & PCW (Process Cooling Water) work, insulation works for PCW pipe, equipments installation work for PCW system
 8  Long Phu 1 Thermal Power Plant  06/2016 - 2018  LILAMA/PVN  Installation of boiler steel structure
 9  Song Hau 1 Thermal Power Plant  06/2016 - 2018  LILAMA/Doosan  Supply of main materials and manufacture of steel structure for Turbine Building
 10  Thai Binh 2 thermal power plant  12/2014 - 2018  LILAMA / PVX  Erecting tuabin/generator system and accessories